中文
English
HOME
Links
Sitemap
Contact Us
Career
The A321 airframe heavy maintenance contract with Air Macau.
On May 10th, 2007, EGAT signed a heavy maintenance contract with Air Macau for 2ea A321 C check. The first C check will be performed in November.
back
Best viewed with 1024x768 with IE 5.5 or above. Copyright and Disclaimer © EGAT